• HOME PAGE
  • MAGAZINE
  • SUBSCRIPTION
  • IMPRINT
  • CONTACT
Yacht News Turkey
Turkish Pandi
No Result
View All Results
  • Neta Trend
  • Spotlight
  • Futuristic
  • MARINE AGENDA
  • Interview
  • Yacht Club
  • BLUE ROUTES
  • Authors
  • Change language to Turkish
E-JOURNAL
Yacht News Turkey
  • Neta Trend
  • Spotlight
  • Futuristic
  • MARINE AGENDA
  • Interview
  • Yacht Club
  • BLUE ROUTES
  • Authors
  • Change language to Turkish
No Result
View All Results
Yacht News Turkey

“Technical Cooperation between Reviva Refit and M/Y Grand Rusalina enters its 4th Year”

Yacht News Turkey by Yacht News Turkey
March 5, 2026
in Futuristic
“Technical Cooperation between Reviva Refit and M/Y Grand Rusalina enters its 4th Year”

Mengi Yay Shipyard's specialist refit brand Reviva Refit has launched the R11.4 maintenance and refit project of the iconic expedition yacht M/Y Grand Rusalina. This technical partnership, now in its fourth consecutive year, includes the yacht's 5-year RINA class survey and comprehensive mechanical overhaul at Tuzla facilities.

ISTANBUL - A rising name in the global superyacht maintenance and repair market Reviva Refit, one of the most prestigious projects in its portfolio M/Y Grand Rusalina’is welcoming back the yacht. The 50-meter expedition yacht, built by Trinity Yachts, was towed ashore at the shipyard's modern facilities in Tuzla as of January 2026 in line with the planned maintenance schedule.

Uninterrupted Service and Operational Continuity

Grand Rusalina management's choice of Reviva Refit for four years in a row is considered an indicator of the shipyard's technical competence and sustainable service quality. Project R11.4 The work carried out within the scope of the project is managed by expert teams who are familiar with the yacht's systems, in the light of data based on operational history.

Project R11.4: Technical Scope of Work

The project, scheduled for delivery in April 2026, includes the following technical processes aimed at maximizing the yacht's round-the-world capability and aesthetic standards:

  • 5 Years RINA Class Survey: Certification renewal process for full compliance with international maritime standards.
  • Mechanical and Auxiliary Machines: Comprehensive heavy maintenance of main engine systems and generators.
  • Body and Paint Works: Complete painting of the hull and updating of the corrosion protection systems.
  • Valve and Pipe Circuits: Dismantling and maintenance of all valve systems, testing and making necessary changes.
  • Interior and Exterior Design Renovations: Upholstery modernization of deck upholstery and lounge furniture.

Project Calendar

The schedule of the project, which is carried out in coordination between the shipyard and ship management, was determined as follows:

  • Tuzla Arrival December 29, 2025
  • Disembarkation (Hauling): January 6, 2026
  • Launching: April 7, 2026
  • Final Delivery: April 22, 2026

Tags: M/Y Grand Rusalinareviva refit

Popular news

  • Trends
  • Latest news

A Journey Through Time with Begüm Doğulu's Photo Album

BAZ Yacht Design Completed the Interiors of ILIAD 53F Offgrid Hybrid

BAZ Yacht Design Completed the Interiors of ILIAD 53F Offgrid Hybrid

“Invisible” Risks in Yacht Safety: An Engineering Analysis of the Yalikavak Case

“Invisible” Risks in Yacht Safety: An Engineering Analysis of the Yalikavak Case

Eternal Spark's Artistic Staircase Enchanted with the ‘Best Detail’ Award

Eternal Spark's Artistic Staircase Enchanted with the ‘Best Detail’ Award

Sirena Yachts has reached the final stage of its largest project to date, Sirena Superyachts 42M. The 42-meter flagship is scheduled to be launched in the first half of July 2026 as planned.

Sirena Superyachts 42M Counting Days to Launch

BAZ Yacht Design Completed the Interiors of ILIAD 53F Offgrid Hybrid

BAZ Yacht Design Completed the Interiors of ILIAD 53F Offgrid Hybrid

As the spring wind begins to make itself felt on the Aegean coast, the Jimmy Key Universail Sailing Regatta, which has a well-established place in Turkey's university sailing calendar, is once again turning its route off Urla.

Jimmy Key Universail Launches in its 15th Year: Young Fleet Takes to the Aegean Offshore

Excitement is back on April 23rd with the 7th Presidential International Yacht Races

Excitement is back on April 23rd with the 7th Presidential International Yacht Races

Yacht News Turkey

Everything About the Turkish Yacht Industry

Categories

  • Neta Trend
  • Spotlight
  • Futuristic
  • Marine Calendar
  • Interview
  • Yacht Club

Pages

  • Home
  • Advertising & Sponsorship
  • Privacy Policy
  • E-Journal
  • Imprint
  • Communication

Latest News

Sirena Yachts has reached the final stage of its largest project to date, Sirena Superyachts 42M. The 42-meter flagship is scheduled to be launched in the first half of July 2026 as planned.

Sirena Superyachts 42M Counting Days to Launch

BAZ Yacht Design Completed the Interiors of ILIAD 53F Offgrid Hybrid

BAZ Yacht Design Completed the Interiors of ILIAD 53F Offgrid Hybrid

© 2022 Designed by Nano Design

No Result
View All Results
  • Home
  • Neta Trend
  • Futuristic
  • Marine Calendar
  • Authors
  • Interview
  • Yacht Club
  • Spotlight
  • Motor yacht
  • Sailboat
  • E-Journal
  • Subscription
  • Communication

© 2022 Designed by Nano Design

We've detected you might be speaking a different language. Do you want to change to:
Change language to Turkish Turkish
Change language to Turkish Turkish
English
Change Language
Close and do not switch language